Manage stand orders
Select Option

YETEN Combustion & Energy Technologies Ltd. Co

Des Sanayi Sitesi, 113. Sokak, CO4 Blok No: 33 Umraniye, 34775 Istanbul
Turkey
Telephone +90 216 4202218
Fax +90 216 5271575
info@yetencombustion.com

Submit your contact details

Provide your contact details to the exhibitor. Optionally, you may also add a personal message.

Please log in

You must be logged in to send the contact request.

An error has occurred

Please check your internet connection or try again later.

Message has been sent

Your message to the exhibitor was sent successfully.

Hall map

glasstec 2022 hall map (Hall 12): stand C33

Fairground map

glasstec 2022 fairground map: Hall 12

Contact

Nihat Enes TURAN

Asst. General Manager

Please log in

You must be logged in to use matchmaking

Please log in for matchmaking

Registration is required to use the networking service and a separate registration for matchmaking. Please register for Matchmaking first.

Let's get started!

Welcome to Matchmaking. Would you like to get in touch with ?

Visit us

Hall 12 / C33

20 Sep 2022

Topic

08:00

Showcase of Refractory Dry - Out Burner Systems

Visit us at booth 12/C33 to see our latest refractory dry - out burner systems!

More Less

Our range of products

Product categories

  • 01  Glass production/Production Technology
  • 01.04  Glass melting technology
  • 01.04.09  Combustion technology
  • 01.04.09.01  Combustion technology for oil and gas fired melting furnaces

Combustion technology for oil and gas fired melting furnaces

Our products

Product category: Combustion technology for oil and gas fired melting furnaces

Refractory Dry - Out Burner Systems

YETEN Combustion offers custom designed, compact Refractory Dry - Out Burner Systems for glass furnace heat - up applications.  With their advantages and user friendly features, our systems are highly preferred by refractory installer companies, dry - out teams and glass producers around the world.

More Less

Company news

Date

Topic

19 May 2022

YETEN Combustion Delivers 14 Sets of Refractory Dry - Out Burner Systems to a Glass Producer Company

YETEN Combustion successfully delivered 14 sets of custom made refractory dry-out burner systems to a glass producer company. Along with the burners, systems include control cabinets acc. to EN 746 – 2 European combustion safety standards, combustion air fans and integrated gas trains. Customer will travel these systems between their factories around the world and use them for glass furnace heat - up.

CUSTOM DESIGNED, COMPACT SYSTEMS
Systems are custom designed acc. to the customer ‘s specific needs as compact, user friendly systems. Components of the systems such as burner body, burner flame tube, combustion air fan, gas train, control cabinet and etc. can be stored inside the transport car. Transport car is coated with hot dip galvanizing against any corrosion.

HIGH XS AIR OPERATION
Burners are suitable for working with λ: 40 (Fuel/Air Ratio: 1/395). This way, very precise temperature control can be achieved. System ‘s fan capacity is 50 % higher than standard systems, this allows burner to pressurize the chamber atmosphere. As a result, uniform temperature distribution is achieved and lifetime of the refractory is elongated.

PORTABLE TEMPERATURE RECORDING UNITS
Along with the dry-out systems, portable temperature recording units with 40 pcs of K Type Thermocouple inputs are provided, so customer can monitor and record temperature changes during heat - up. Thermocouple quantities can be arranged acc. to the customer requests. Measured temperatures can be transferred to the main system with USB, Ethernet, Wi-Fi, Modbus TCP and etc.

INTEGRATED GAS & AIR FLOW MEASUREMENT SYSTEMS
Gas and air flow rates of the burners can be seen on the display of the 2 channel flow transmitter inside the transport car and on the recorder ‘s display. With this feature, operators can easily follow the system ‘s condition. They can adjust the fuel/air ratio of the burner more precisely with minimum effort.

More Less

About us

Company data

Foundation 1987